Industry / Sector: 3rd party logistics services/Distribution
Location: Billingham
Size (sqft): 90,000
Timescales: 12 weeks
Work included: Design and installation of drive-in racking to store 16,000 pallets of boxed snacks, the system has been designed (future proofed) to accommodate 1000kg pallets at a later date.